The business case for adapting buildings to climate change
On 2 June 2015, at the Vision Conference in London, Innovate UK (previously the Technology Strategy Board) launched the final report of the Design for Future Climate: Adapting Buildings (D4FC) programme, 'The business case for adapting buildings to climate change: Niche or mainstream?' by Matt Thompson, Ian Cooper and Bill Gething. The launch of the full report followed publication of an Executive Summary in November 2014.
The report is the culmination the 4-year D4FC programme which included work by 240 companies and generated a body of evidence about how buildings exposed to climate risks can be adapted. It responds to the Government's National Adaptation programme and considers adaptation to climate change at the scale of individual buildings.
The report is based on the observations from a designers group and a client's group and assesses the key drivers affecting the market for design services to adapt buildings in preparation for a changing climate. In the foreword, Mark Wray, Lead Technologist in the Built Environment team at Innovate UK suggests that, “The subject is complex and full of uncertainties, but for firms who respond it seems likely that there will be early adopter commercial advantages as climate hazards become more prevalent and as pressure on clients to consider adaptation grows. Properly managed and exploited, the momentum gained should put the UK at the forefront of the dawning international market for adaptation services in the built environment, which grew by over 5% last year.”
The report proposes that the challenge is to optimise building design for a phased transition to anticipated future needs, making use of maintenance cycles for upgrades. It sets out seven key messages:
- The market for design services to adapt buildings to future climate change remains very limited.
- The limited market is not an excuse for building design professionals to do nothing.
- Construction clients risk procuring stranded assets.
- The government must signal that adaptation in the built environment is a critical issue.
- At present, the construction and property industries have no adaptation plan to tackle climate change.
- Clients and professionals urgently need educating in climate change adaptation for buildings.
- There is a need for a programme of monitoring and evaluating the performance of climate adapted buildings.
It suggests that lack of willingness by clients to engage with the problem dampens designers motivation and reduces the scope for the market to develop, but the report identifies mounting pressure on clients from the insurance industry, investment institutions and financial stakeholders.
Recommendations include:
- Developing construction client decision-making tools.
- Updating standard terms and conditions to account for climate change adaptation services.
- Developing a protocol for assessing the risk to buildings from climate change hazards.
- Develop computational tools to standardise the way that climate change projections are used by designers.
- Updating standards, planning and building regulations to accommodate climate change adaptation, including the use of future weather data in the building regulations at their next revision.
- Public procurement and maintenance regimes considering future climate change and the development of buildings with adaptive capacity.
- Establishing a programme of research to reduce the uncertainty of future climate impacts on the built environment at the local site-based scale.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Building engineering physics.
- Energy targets.
- Environmental policy.
- Green deal.
- Greenhouse gases.
- Hex House project.
- Innovate UK.
- Kyoto protocol.
- Stranded assets.
- Sustainability.
- Sustainable materials.
- The Carbon Plan: Delivering our low carbon future.
- The Low Carbon Transition Plan: National strategy for climate and energy.
- UK Climate Change Risk Assessment.
- Zero carbon homes.
- Zero carbon non-domestic buildings.
Featured articles and news
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.